<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0">
  <channel>
    <title>Qualla: Moorside Nuclear Power Station</title>
    <link>https://qualla.com/moorside-nuclear-power-station</link>
    <description><![CDATA[The 3.4-gigawatt nuclear station that almost rose beside Sellafield, then collapsed under a cascade of corporate bankruptcies and withdrawals.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Wed, 08 Jul 2026 02:40:16 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[The 3.4-gigawatt nuclear station that almost rose beside Sellafield, then collapsed under a cascade of corporate bankruptcies and withdrawals.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_res/siteimages/rsslogo.png"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_res/siteimages/rsslogo.png</url>
      <title>Qualla: Moorside Nuclear Power Station</title>
      <link>https://qualla.com/moorside-nuclear-power-station</link>
    </image>
    <item>
      <title>Moorside Nuclear Power Station: Introduction</title>
      <link>https://qualla.com/moorside-nuclear-power-station/</link>
      <description><![CDATA[Some of the most expensive infrastructure projects in British history are the ones that never get built. Moorside is a case study. For just over a decade, a 200-hectare plot of West Cumbrian farmland north of Sellafield was destined to become the largest new nuclear power station in Britain in a generation - three reactors, 3.4 gigawatts of capacity, a £2.8 billion grid connection threaded under Morecambe Bay to spare the Lake District National Park. Today, the site sits empty. The story of why is a slow-motion corporate disaster, told in press releases and quiet liquidations.]]></description>
      <content:encoded><![CDATA[<p>Some of the most expensive infrastructure projects in British history are the ones that never get built. Moorside is a case study. For just over a decade, a 200-hectare plot of West Cumbrian farmland north of Sellafield was destined to become the largest new nuclear power station in Britain in a generation - three reactors, 3.4 gigawatts of capacity, a £2.8 billion grid connection threaded under Morecambe Bay to spare the Lake District National Park. Today, the site sits empty. The story of why is a slow-motion corporate disaster, told in press releases and quiet liquidations.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/moorside-nuclear-power-station/">Moorside Nuclear Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Thu, 28 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Moorside Nuclear Power Station: The Site That Wanted a Reactor</title>
      <link>https://qualla.com/moorside-nuclear-power-station/</link>
      <description><![CDATA[The land came first. In October 2009, a joint venture of Iberdrola, GdF-Suez and Scottish & Southern took an option on 190 hectares immediately north of the existing Sellafield complex - the obvious place for new nuclear in Britain, given the existing workforce, the infrastructur...]]></description>
      <content:encoded><![CDATA[<p>The land came first. In October 2009, a joint venture of Iberdrola, GdF-Suez and Scottish & Southern took an option on 190 hectares immediately north of the existing Sellafield complex - the obvious place for new nuclear in Britain, given the existing workforce, the infrastructur...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/moorside-nuclear-power-station/">Moorside Nuclear Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Thu, 28 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-the-site-that-wanted-a-reactor.mp3</guid>
      <enclosure url="https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-the-site-that-wanted-a-reactor.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Moorside Nuclear Power Station: The Westinghouse Crash</title>
      <link>https://qualla.com/moorside-nuclear-power-station/</link>
      <description><![CDATA[On 28 March 2017, the UK Office for Nuclear Regulation issued a Design Acceptance Confirmation for the AP1000 reactor - the formal sign-off, after years of review, that the design met British safety standards. The next day, 29 March 2017, Westinghouse filed for Chapter 11 bankrup...]]></description>
      <content:encoded><![CDATA[<p>On 28 March 2017, the UK Office for Nuclear Regulation issued a Design Acceptance Confirmation for the AP1000 reactor - the formal sign-off, after years of review, that the design met British safety standards. The next day, 29 March 2017, Westinghouse filed for Chapter 11 bankrup...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/moorside-nuclear-power-station/">Moorside Nuclear Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Thu, 28 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-the-westinghouse-crash.mp3</guid>
      <enclosure url="https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-the-westinghouse-crash.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Moorside Nuclear Power Station: The Korean Rescue That Wasn&apos;t</title>
      <link>https://qualla.com/moorside-nuclear-power-station/</link>
      <description><![CDATA[In December 2017, NuGen named the Korea Electric Power Corporation (Kepco) as preferred bidder to take over the project from Toshiba. The plan, broadly: swap the troubled American AP1000 for Korea's APR-1400, a design already operating at the Shin Kori plant in South Korea and be...]]></description>
      <content:encoded><![CDATA[<p>In December 2017, NuGen named the Korea Electric Power Corporation (Kepco) as preferred bidder to take over the project from Toshiba. The plan, broadly: swap the troubled American AP1000 for Korea's APR-1400, a design already operating at the Shin Kori plant in South Korea and be...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/moorside-nuclear-power-station/">Moorside Nuclear Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Thu, 28 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-the-korean-rescue-that-wasnt.mp3</guid>
      <enclosure url="https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-the-korean-rescue-that-wasnt.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Moorside Nuclear Power Station: Clean Energy Hub, or What Might Yet Happen</title>
      <link>https://qualla.com/moorside-nuclear-power-station/</link>
      <description><![CDATA[Even before the dust settled, new proposals appeared. In July 2020, an EDF-led consortium announced interest in building two EPR reactors at the site, a design already under construction at Hinkley Point in Somerset. On 30 June 2020 a separate Rolls-Royce-led UK Small Modular Rea...]]></description>
      <content:encoded><![CDATA[<p>Even before the dust settled, new proposals appeared. In July 2020, an EDF-led consortium announced interest in building two EPR reactors at the site, a design already under construction at Hinkley Point in Somerset. On 30 June 2020 a separate Rolls-Royce-led UK Small Modular Rea...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/moorside-nuclear-power-station/">Moorside Nuclear Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Thu, 28 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-clean-energy-hub-or-what-might-yet-happen.mp3</guid>
      <enclosure url="https://qualla.com/_m/g/c/t/t/moorside-nuclear-power-station-wp/gctt-moorside-nuclear-power-station-clean-energy-hub-or-what-might-yet-happen.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
  </channel>
</rss>
